Revamp Design for Crude Oil Booster Pump Station

Revamp Design for Crude Oil Booster Pump Station

Client Sideris Refining and Storage Co.
Location Sohar, Oman
Duration Aug 2023 – Jul 2024 (11 Months)
Engineering Revamp Design for Crude Oil Booster Pump Station in Oman

Scope of Work

Caldera Engineering Consultants delivered a comprehensive revamp design for an aging crude oil booster pump station aimed at increasing throughput by 35%.

The project required re-engineering pump configurations, upgrading motor control systems, and integrating modern technologies within a constrained brownfield environment — all while maintaining uninterrupted facility operations.

Services Provided

  • Hydraulic re-evaluation and optimized pump selection
  • Detailed piping layouts and tie-in engineering
  • Electrical system upgrade design and integration
  • Control system modernization and DCS integration
  • Shutdown planning and constructability assessment

Disciplines Involved

Rotating Equipment Engineering, Electrical Engineering, Process Engineering, Instrumentation, Safety Engineering

Key Outcomes

  • 35% throughput enhancement
  • 40% reduction in power consumption through VFD optimization
  • Seamless DCS integration without operational shutdown